Thermal power capacity addition in India decreased by 32% in FY25, with only 3.9 GW installed by February. The slowdown is linked to project execution issues, even as the country aims to increase coal-based capacity to meet rising energy demands.
from mint - news https://ift.tt/WHgB2hE
Thermal power capacity addition slows 32% in FY25 due to project execution problems
April 14, 2025
0
Tags